SZM 100 Quartz Based Concrete Surface Hardeners

 

Description: It is a mixture of a material which consists of SZM 100 cement, pigment, chemical ingredients, and tough mineral (Quartz) aggregate and ready powder concrete surface hardeners.

 

Application Areas:   Floor coverings of houses, industrial and commercial buildings

                                 Garages, petrol stations, car parks

                                 Places where storage and loading are done

                                Workplaces, factories, shipyards

                                 Shops, offices, supermarkets, large stores etc.

 

Features:                It enables the highly resistance of surface abrasion.

                                It decreases the surface’s getting dusty

                                It increases the life-span of surface.

                                Different colours are available (grey, light grey, yellow, red and green)

Not only primary colours but also different colours are provided for special usages. It is quite durable against the bumps and freeze.

 

Application:                                                             

                  After the process of lining and moulding of concrete  the thickness which is at least 8 cm  has finished, if there is water on the surface it is removed.  Depending on the heat of the atmosphere, the plug of the first 45 minutes is waited. Then SZM 100 is scattered to the surface twice as 5 kg./ m². After chopper, trowel, polish processes have finished, it is finished by applying the cure as 0,2 kg./ m² in advance.

 

Note: In colourful applications 7 kg./ m², and for highly resistance 9 kg./ m² are advised to use.

 

Technical Information:

                     Package : a 25 kg plastic bag, a 1- tonne palette

                     Colour    : concrete grey, light grey, red, yellow and special colours

                    Curing Time: Variable according to the features of concrete and heat of the atmosphere

                    Traffic of Pedestrian : 1 – 2 days

                     Fully Curing Time: 28 days

                     Resistance of Pressure : 75 – 100 N / mm²

                     Consumption : 4 – 8 kg /m²  (on average 5 kg. / m²)

                     Density : 1,8 kg. / litre dry powder

                     Storage : 8 months in its original packages and dry atmosphere (+ 5°C and + 30°C)

                                                                                                                                         Turn back    home page